Skytrain (BTS railway) and metro (MRT subway)
BTS Skytrain operates from 06.00 - 24.00 hours everyday with two main lines - Sukhumwit and Silom lines.
On the birthday of HM King Rama IX, 5 December 1999, an elevated two-line Skytrain (officially called BTS) metro system was opened.
click to enlarge & download map
in pdf
The remains of the failed oject can still be seen all the way from the main railroad station out towards Don Mueang Airport. Due to the Asian financial crisis of 1997 construction was halted and the concrete pillars were left unused.
The MRT subway system opened for use in July 2004. The MRT connects the northern train station of Bang Sue to the Hua Lamphong central railway station near the city centre, while also going through the eastern part of Bangkok. It connects to the BTS system at BTS stations Mo Chit, Asok, and Sala Daeng.
Currently, transit and development projects initiated by ousted former Prime Minister Thaksin are gaining in popularity with the currently elected government, and have a possibility of being resumed and extended.
A new high speed elevated railroad called the Suvarnabhumi Airport Link connect the city with the new Suvarnabhumi Airport since december 2010. The rate for come from Airport to center of Bangkok is around 70 Thb.
There are plans to extend the line to Don Mueang and Rangsit, but again, this is very dependent on the political situation.
Plans have been approved for a further extension of the BTS Silom line from Wongwian Yai to Bangwah (4.5 km/2.8 mi), Sumrong to Samut Prakarn (8 km/5.0 mi), Mo Chit to Saphan Mai (11.9 km/7.4 mi) and the National Stadium to Phran Nok (7.7 km/4.8 mi). This includes five underground stations in the Rattanakosin area.
The State Railway of Thailand has also been given approval to complete the Dark Red and Light Green lines. Alongside, MRT has also begun construction on two new lines, the Purple line from Bang Yai to Bang Sue, and the Blue line from Hua Lampong to Bang Khae and Ta Pra.
Skytrain station (BTS) |
|
Subway station (MRT) |